Project management is the craft of getting a defined piece of work finished on time and on budget, and it has a richer history than its spreadsheets suggest. Its tools were shaped by factory floors, missile projects and software teams, and its vocabulary borrows from sport, road construction and Japanese manufacturing. This quiz covers the fundamentals a course or certification would expect, such as schedules, budgets, roles and the acronyms that fill a status report, alongside Agile and Scrum terms for IT teams. It also tells the stories people remember: the landmark that opened a decade late, the spacecraft lost to a units mix-up, and the adages that explain why everything takes longer than promised. It is written for students revising for an exam, project managers who want a quick warm-up for a team meeting, and anyone curious about how big things get built. Every answer comes with a short explanation, so you can play it straight through or print the questions for a group.
30 of 50 questions with answers and explanations. Play the quiz
Q 01Which Australian landmark opened ten years late in 1973, at more than fourteen times its original budget?
Sydney Opera House
Sydney Opera House architect Jørn Utzon resigned in 1966 after rows over cost and delay, leaving an Australian team led by Peter Hall to complete his design.
Q 02The Agile framework Scrum takes its name from which sport, via a 1986 Harvard Business Review paper?
Rugby
Rugby inspired the name: authors Hirotaka Takeuchi and Ikujiro Nonaka likened the best development teams to players who go the distance as a unit, passing the ball back and forth.
Q 03Jira, the issue tracker used by software teams, is named after the Japanese name of which movie monster?
Godzilla
Godzilla is Gojira in Japanese, and Jira keeps the last two syllables. Atlassian's developers had used the nickname for Bugzilla, the bug tracker they relied on before writing their own.
Q 04Which adage, coined in a 1955 Economist essay, says that work expands to fill the time available?
Parkinson's law
Parkinson's law grew out of naval historian C. Northcote Parkinson's experience of the British Civil Service. His follow-up 'law of triviality' gave us the word bike-shedding.
Q 05Which American engineer popularised, around 1910, the bar chart of tasks against time that bears his surname?
Henry Gantt
Henry Gantt popularised the chart around 1910–1915, but Karol Adamiecki had devised a similar 'harmonogram' in 1896 and published it only in Russian and Polish, so his name never stuck.
Q 06Which city's Olympic stadium, nicknamed 'The Big Owe', took thirty years to pay off?
Montreal
Montreal finally cleared the bill for its 1976 Olympic stadium in November 2006, helped by a special tobacco tax. The total had reached C$1.61 billion.
Q 07In project scheduling, which term names a key checkpoint, such as a phase sign-off, that has no duration of its own?
Milestone
Milestone is borrowed from the roadside distance stones of ancient Rome, first set up on the Appian Way. On a project timeline it flags a point such as a start date, an end date or a budget review rather than a piece of work.
Q 08Kanban, whose name means 'signboard' in Japanese, was developed by engineer Taiichi Ohno at which carmaker?
Toyota
Toyota began studying supermarkets in the late 1940s, and kanban copies their shelves: a card signals that stock has been used, and only then is more made.
Q 09Which New York skyscraper was structurally complete in 1931, just 410 days after construction began?
Empire State Building
Empire State Building steelwork topped out in only 23 weeks, twelve days early. The whole tower cost about $41 million, including the demolition of the old Waldorf-Astoria hotel on the site.
Q 10Which word completes the term 'scope ___', meaning uncontrolled growth in what a project must deliver?
Creep
Creep is the word: scope creep also goes by requirement creep or kitchen sink syndrome, and software teams know its cousin as feature creep.
Q 11Which NASA spacecraft was lost in 1999 because its builder used US customary units while NASA used metric?
Mars Climate Orbiter
Mars Climate Orbiter went silent on 23 September 1999 as it tried to enter orbit. An investigation blamed a mismatch between Lockheed Martin's figures and the newton-seconds NASA's software expected.
Q 12Kaoru Ishikawa's cause-and-effect diagram of the 1960s is nicknamed after the skeleton of which animal?
Fish
Fish is the animal: the problem sits at the head, facing right, and possible causes branch off the backbone like ribs. Ishikawa pioneered his quality methods in the Kawasaki shipyards.
Q 13In the acronym SMART, set out by George Doran in 1981 for writing objectives, what does the M stand for?
Measurable
Q 21Which sequential development model is usually traced to a diagram in a 1970 paper by Winston Royce?
Waterfall
Waterfall is a word Royce's paper never uses. He drew the famous diagram as an example of a flawed process, calling it 'risky' because testing came only at the very end.
Q 22Which nickname is given to the project management model in which cost, time and scope constrain one another?
Iron triangle
Iron triangle thinking goes back to Martin Barnes, who in 1969 drew a triangle with cost, time and quality at its corners for a course on contract control.
Q 23The Agile Manifesto was drafted in 2001 by seventeen developers at the Snowbird ski resort in which US state?
Utah
Measurable was Doran's M. His other letters stood for specific, assignable, realistic and time-related, so the 'achievable' many people learn today was not in his original list.
Q 14A SWOT analysis weighs strengths, weaknesses and opportunities against which fourth factor, the T?
Threats
Threats complete the set. Strengths and weaknesses are usually treated as internal, while opportunities and threats are usually seen as coming from outside.
Q 15Which rule of thumb, named after an Italian economist, says about 80% of results come from 20% of causes?
Pareto principle
Pareto principle is the label that grew from Joseph Juran's 1941 reading of Vilfredo Pareto, who had shown that about 80% of the land in Italy was owned by 20% of the population.
Q 16In Six Sigma's martial-arts-style ranks, which belt colour sits above Green and marks a full-time specialist?
Black
Black Belts devote all of their time to Six Sigma, while Green Belts take it on alongside their other job responsibilities. Master Black Belts act as internal coaches to both.
Q 17Which US city's 'Big Dig' buried a downtown highway and became America's most expensive road project?
Boston
Boston's Big Dig was scheduled to finish in 1998 for $2.8 billion. It wrapped up in December 2007 at $14.6 billion, after leaks, design flaws and criminal charges.
Q 18Which European capital's new airport opened in 2020, nine years late, after faulty construction and corruption?
Berlin
Berlin Brandenburg Airport was due to open in October 2011 and finally welcomed passengers on 31 October 2020, 14 years after construction started.
Q 19In startup jargon popularised by Eric Ries, what does MVP stand for, a first release with just enough features?
Minimum viable product
Minimum viable product was coined in 2001 by Frank Robinson. The idea is to put something usable in front of early customers and let their feedback steer what gets built next.
Q 20Bruce Tuckman's 1965 model says teams go through forming, norming, performing and which conflict-ridden stage?
Storming
Storming comes second, when members start to voice opinions and clash as power and status are assigned. Tuckman held that every phase was necessary and inevitable for a group to grow.
Utah won what one attendee called the fiercest debate of all, the venue, beating wintry Chicago and the Caribbean island of Anguilla because enough of the group wanted to ski.
Q 24In Scrum, what name is given to the fixed work cycle that most commonly lasts two weeks?
Sprint
Sprint is the term, also known as an iteration or timebox. Each one opens by setting a target and closes with a demonstration of the finished work to gather feedback.
Q 25In project scheduling, what name is given to the longest chain of dependent tasks from start to finish?
Critical path
Critical path analysis was developed in the late 1950s by Morgan Walker of DuPont and James Kelley of Remington Rand. A slip in any task on it pushes back the whole finish date.
Q 26Which organisation, established in 1969, publishes the PMBOK Guide and awards the PMP credential?
Project Management Institute
Project Management Institute founders included staff from McDonnell Douglas and Brown & Root. It held its first PMP exam in 1984, and by May 2020 over a million people held the credential.
Q 27In the PMBOK Guide, a standard reference for project managers since 1996, what does BOK stand for?
Body of Knowledge
Body of Knowledge is the phrase. Earlier editions of the guide were recognised as formal standards by both the American standards organisation ANSI and the engineering society IEEE.
Q 28In WBS, the tree diagram that maps every deliverable in a project's scope, what does the B stand for?
Breakdown
Breakdown is the B in work breakdown structure. Its '100% rule' says the pieces must add up to all of the work in the project's scope, with nothing left out and no overlaps.
Q 29In a RACI chart, which maps who does what on a project, what does the letter A stand for?
Accountable
Accountable marks whoever is individually and ultimately answerable for a task's success or failure. The other three letters stand for responsible, consulted and informed.
Q 30Which project document is a repository for every identified uncertainty, with its owner and mitigation measures?
Risk register
Risk register entries record the nature of each risk, who owns it and how it will be handled. The finished list can be displayed as a simple table or as a scatterplot.